State Route 360 Widening and Reconstruction

Roadway

6.3 miles of urban widening and reconstruction from existing a 2-lane road to a 4-lane divided facility with two 12’ lanes in each direction. This project scope includes staged full depth road reconstruction, 37,000 feet of waterline, 43,000 feet of storm drain, 5 cast-in-place staged culverts, 1 precast arch culvert, and a multi span bridge.

Location: Cobb and Paulding County
Category: Widening | Urban Development | Structures | Underground Utilities



← Back to Projects

kingroyal meritking