Jones Bridge Road Widening and Reconstruction

Concrete Structures

2 miles of urban widening and reconstruction aimed to reduce congestion and delay. The project scope included stage full depth reconstruction, 5 precast underground detention basin systems, over 1,500 feet of cast-in-place retaining walls, 3 traffic signal installations and over 8,000 feet of 12 inch diameter water main relocation.

Location: Johns Creek, GA
Category: Widening | Urban Development | Underground Utilities | Electrical

Signal lightingStructure work

← Back to Projects

kingroyal meritking